NG Toolset開發筆記--5GNR Resource Grid(14)

7/10號完成PRACH需求分析Part II:(refer to 38.211/38.213/38.214/38.331) PRACH資源映射: 38.211 Section5.3.2 OFDM baseband signal generation for PRACH 其中: l  l   is given by clause 6.3.3; 表示RACH兩邊預留的guard subcarrier
相關文章
相關標籤/搜索